From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • How BluEnt Works

    AEC Technology Quality Assurance

    Work scoped in writing, reviewed before it leaves, and checked against what was agreed.

    Talk to Someone Who Has Built This
    Banner image for Quality & Methodology

Quality & Methodology

Quality at BluEnt is not a final inspection. It is built into how an engagement is shaped from the first conversation: what will be delivered is written down before work begins, every deliverable is reviewed before it reaches the client, and acceptance is judged against criteria both sides agreed at the start.

The method is the same whether the work is a data pipeline, a fabrication route or a governance framework, so the firm knows what to expect from each engagement.

  1. DefinedOutputs written down
  2. PreparedInputs agreed up front
  3. BuiltWork built to the scope
  4. CheckedA second-person check

AEC technology quality assurance at a glance

How work is defined
Named outputs, agreed in writing before work begins
How work is checked
Reviewed before delivery, then tested against agreed acceptance criteria
Who signs off
The firm's named owner for each scope
What is handed over
The work, its documentation, and a runbook or guide where it will be run or maintained
Where it starts
A Project Data Walkthrough, at no charge

Where quality usually breaks

Most delivery problems start with work that was never defined precisely.

When the definition is loose, review becomes opinion.

Most delivery problems are not caused by poor work. They are caused by work that was never defined precisely enough to be checked.

A scope that says "a reporting dashboard" or "clean up the templates" cannot be accepted or rejected, only argued about. When the definition is loose, review becomes opinion, testing has nothing to test against, and the handover arrives without the documentation the firm's own team needs to run what was built.

The method below closes each of those gaps in order.

How every engagement is controlled

Six control points, from the first scope to the handover.

Each one gives the next something specific to check against.

Scope

Named outputs, inputs, responsibilities and exclusions are written down and agreed before work begins

Preconditions

What the firm provides is agreed up front: access to systems, a named owner, sample data or jobs

Build

The work is carried out against the written scope

Review

Each deliverable is reviewed by a second person before it reaches the client

Acceptance

The work is tested against acceptance criteria agreed at the start, with the firm's named owner

Handover

Documentation, a runbook or a maintenance guide, and the record of what was tested

How a deliverable is checked

Every type of work is checked the way its own discipline demands.

From reconciled totals to dry runs on the firm’s own machines.

Data pipelines and models

Data pipelines and models are reconciled against the source system's own reports until the totals agree, and finance signs that reconciliation off. See single-source pipeline build.

Fabrication routes and machine output

Fabrication routes and machine output are proven on sample jobs and in dry runs on the firm's own machine, without material, before anything reaches production. See CNC post-processor configuration.

Templates and standards

Templates and standards are piloted on one live project, and anything that does not hold up in practice is corrected before the standard is deployed.

Workflows

Workflows are built in a test area of the firm's own environment and tested with real documents before they run in production.

Governance and assessment work

Governance and assessment work is drafted by BluEnt and approved by the firm's named owner, so the framework reflects how the firm actually works.

Scoped in writing, or scoped in conversation

The difference is whether “done” was agreed before the work began.

Each row shows what changes when the scope is written down.

What "done" meansWhatever each side remembersNamed outputs, agreed before work begins
How errors are foundBy the client, after deliveryIn review, before delivery
How acceptance is decidedBy opinionAgainst agreed criteria
What the firm is left withThe work, and questionsThe work, its documentation, and the test record

What the firm owns

What stays with the firm once the work is delivered and paid for.

Written so the firm’s own team can run and extend it.

The work is the firm's once it is delivered and paid for. Documentation, runbooks and guides are written so the firm's own team can run and extend the work without depending on the people who built it.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. Security & SOC 2.

Questions procurement and IT teams ask

Straight answers on scope, review, acceptance and handover.

Each answer reflects how every engagement is scoped, checked and handed over.

How is the scope of an engagement agreed?

In writing, before work begins: the named outputs, the inputs the firm provides, who is responsible for what, and what is excluded. Any change to scope is agreed in writing in the same way.

Is every deliverable reviewed before it is delivered?

Yes. Each deliverable is reviewed by a second person before it reaches the client.

How is the work accepted?

Against acceptance criteria agreed at the start of the engagement, tested with the firm's named owner for that scope. Sign-off is recorded.

What happens when something fails acceptance?

It is corrected and re-tested against the same criteria before sign-off. The criteria do not move to fit the work.

What documentation is handed over?

What the work needs to be run and maintained: a runbook, a maintenance guide or a description of each workflow, plus the record of what was tested.

Does the method change by type of work?

The control points stay the same: scope, review, acceptance and handover. The checks inside them follow the discipline, such as reconciliation for data, dry runs for machines and pilots for standards.

Where does quality and methodology work usually begin?

With a Project Data Walkthrough, at no charge, centred on quality and methodology: one page naming the specific problems found, and one named next step.

Next step

To see how this would work in practice,
talk to the team that does the work.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

No charge. One conversation, then a written scope with named outputs before any work begins.

Or see How BluEnt Delivers. Prefer to write first? Email us your question.