From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • For Information Managers

    Information Management Support for AEC

    Standards and structure that meet a client’s
    information requirements.

    Discuss Your Information Standards
    Banner image for Information Managers

Information management that holds on every project

When a client sends an information requirement, every project has to deliver files in one structure, named one way, by one date.

BluEnt helps information managers put that standard in place once, where files actually live, so it holds on every project that follows.

CLIENT REQUIREMENT Drawings: PDF Names: agreed Models: by stage Due: handover Project 2410 01 Drawings 02 Models 03 Handover named ready DRAWINGS MODELS HANDOVER

Sound familiar?

Three moments most information managers will recognise, and the reason they keep coming back.

CLIENT REQUIREMENT HANDOVER 2345 9101112 16171819

The requirement arrives with a deadline

The client wants drawings, models and documents in a set structure, named a set way, by handover. The project started months ago without that structure, so the files have to be reworked to fit.

? A-101.pdfA101 v2.pdfPlan L1.pdf

One drawing, three names

Each team saves files its own way. Search returns several copies of the same plan, nobody is sure which one is current, and the wrong version can reach the client.

Project files 0 folders, 0 items Licensed

A platform nobody set up

The firm pays for a document platform, but it was never configured. Every project is organised differently inside it, so the platform stores files without holding any standard.

What changes

The same work, with one standard behind it, applied where files are saved rather than remembered by each team.

Each project names and files work its own way

One naming and numbering convention on every project

Client requirements are met by renaming files at the end

The client’s structure is in place from the first day

The platform holds files, but enforces nothing

The platform applies the standard as files are saved

Handover is rebuilt under deadline

Handover information builds up as the project runs

How the work starts

Four steps, from a no-charge conversation to a standard the firm runs itself.

Walkthrough

One conversation and one page naming three problems.

Map the requirement

The client’s requirement, matched to how the firm files work today.

Set the standard

Agreed, then set up on the platform with a template project.

Hand over

Administrators trained, with a one-page field guide.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. See Security & SOC 2.

Questions information managers ask

Will a new standard slow down projects already running?

No. Live projects move into the standard in stages, starting with the ones closest to a client deadline.

Does the firm have to change the platform it already pays for?

No. The standard is set up on the platform the firm already licenses, and connected to the drives and platforms still in use.

Will teams actually follow it?

The standard is applied where files are saved, so following it becomes the easiest way to work. Each team also gets a one-page field guide.

Can the work start with one client requirement?

Yes. The first piece of work is usually the requirement due next, and the same standard then carries to the projects that follow.

Who owns the standard afterwards?

The firm. Its own administrators are trained at handover and keep the standard running.

Next step

If a client information requirement is due,
talk to the team that builds this with BluEnt.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

Prefer to write first? Email us your question. A reply follows with an answer or one named next step.