From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • Interoperability & Fabrication Pipelines

    IFC and COBie Export Automation

    Handover exports set up once, and checked against the client’s requirements before they leave.

    Plan Your IFC and COBie Handover
    A swan in flight over calm water beside a glass building, with fabrication steps shown along the horizon
A Revit model exported through saved configurations, mapped to IFC and COBie, and validated before the export is issued

IFC and COBie export automation replaces project-by-project export setup with a governed configuration.

Exports are defined by discipline and project stage, mapped to the properties the client requires, and checked before they are issued.

At a glance

Who it is for
BIM and VDC leads, and design teams delivering IFC and COBie at handover
Inputs
Revit models, the client’s information requirements, and a sample of past exports
Outputs
Export configurations by discipline and stage, property mappings, a validation check and a guide
Who is responsible
BluEnt sets up and tests. The firm’s BIM lead approves the mappings
Engagement shape
Scoped work with named outputs, agreed in writing before work begins

Why handover exports take so long

On many projects, IFC and COBie exports are set up again by hand.

Each export needs the right categories, property sets and naming, then the result is checked against the client’s requirements one property at a time.

When the setup lives in one person’s settings, the next project starts from nothing, and errors surface only when the client rejects the data.

An export set up again by hand, properties mapped by hand and checked one at a time, until the client rejects the data

What IFC and COBie export automation sets up

Export settings by discipline and stage, checked against the client’s information requirements.

AreaWhat it covers
Export configurationsSaved setups by discipline and project stage
IFC mappingRevit categories and parameters mapped to IFC classes and property sets
COBie mappingModel parameters mapped to the COBie fields the client requires
ValidationExports checked against the client’s information requirements before issue
Exception listMissing or incorrect values listed for correction in the model
GuideHow to apply the setups on new projects, and how to change them
One handover export with its discipline and stage setups and IFC and COBie mappings, validated and with exceptions listed before it is issued

How the work runs

From today’s export settings to a validated setup the firm’s team maintains.

  1. Read the requirements

    The client’s information requirements and a sample of past exports are read with the firm’s BIM lead.

  2. Agree the mappings

    BluEnt drafts the mappings; the BIM lead approves them.

  3. Build

    The export configurations and checks are built by BluEnt.

  4. Test

    The setup is tested on a live model, and every exception is resolved with the project team.

  5. Hand over

    The setup is handed over with the guide.

Set up by hand, or set up once

Each new project

Set up by hand: Starts from nothing

Set up once: Starts from saved configurations

Who can run an export

Set up by hand: One experienced person

Set up once: Anyone following the guide

When errors are found

Set up by hand: When the client rejects the data

Set up once: Before the export is issued

When requirements change

Set up by hand: Every setting is revisited

Set up once: The mapping is updated once

Checked against the client’s information requirements

Every export is validated against the client’s requirements before it leaves the firm. Missing or incorrect values are listed in an exception list, so they are corrected in the model, where they belong, rather than patched in the export. The IFC version is the one the client’s requirements specify.

One export validated against the client’s requirements, with exceptions listed and corrected in the model before it is issued

What this does not cover

  • Formal ISO 19650 information-management roles sit outside this work.
  • Facilities-management system implementation is not included.
  • Model authoring and drawing production are delivered through bluentcad.com.

Drawing production is delivered through bluentcad.com, not through this service.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. Security & SOC 2.

Questions AEC professionals ask

Which IFC versions are covered?

The version the client’s requirements specify. The export configurations are set up to that version and tested before use.

Can COBie be produced without changing the model?

Only if the model already holds the required parameters. Gaps are listed in the exception list, so the firm can decide where the data should be added.

Is this the same as information management under ISO 19650?

No. This work sets up and checks exports. Formal information-management roles under ISO 19650 sit outside this work.

Can the setup be reused on the next project?

Yes. Configurations are saved by discipline and stage, and the guide explains how to apply and change them.

What if the client’s requirements change mid-project?

The mapping is updated once and re-tested, rather than every setting being revisited by hand.

How does a IFC and COBie export automation engagement start?

With a Project Data Walkthrough, at no charge, centred on IFC and COBie export automation: one page naming the specific problems found, and one named next step.

Next step

If handover exports are still set up by hand on every project,
talk to the team that builds this.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

A reply from the team that builds this, with one named next step. Or see information governance and AI-readiness.

Engineering and technology in one firm. The people who build the automation have produced the drawings it reads.