From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • Construction Data & Project Controls

    Construction ERP Data Integration

    Data read reliably from the ERP, project and scheduling systems already in place.

    Connect Your Construction Systems
    Hand-drawn dawn over water: a ledger, a project platform and a schedule feeding a checked load into one data model, with a line-drawn swan
A spreadsheet, a project platform and a schedule, each connected by a pipeline into one reliable stream of project data

Construction ERP data integration reads project, cost and commitment data from the systems a construction business already runs, and loads it into one model.

Every load is checked against its source, so the data underneath reporting can be trusted.

At a glance

What it covers
Reliable, checked data extraction from construction source systems into one model
Systems
Sage 300 CRE, Viewpoint Vista, CMiC, Procore, Autodesk Construction Cloud, Primavera P6 and Microsoft Project
Who is responsible
BluEnt designs, builds and tests. The firm grants access and confirms the control totals
How it is scoped
One source system at a time, with named outputs agreed before work begins
How it starts
A Project Data Walkthrough, at no charge

Why construction systems are hard to connect

Construction systems were built to run a job, not to share data.

Accounting holds cost by cost code, project tools hold commitments, change orders and logs, and schedules hold time.

Each system uses its own project numbering. Connecting them is less about moving data than about meaning: which job, which cost code, which version of a commitment.

One job, three identities

How each system knows the same project

AccountingBy cost code
Project toolBy commitment and change order
ScheduleBy activity

What construction ERP data integration covers

Accounting, project management and scheduling systems connected and read on a schedule.

Source typeWhat is read
Accounting and ERP
Sage 300 CRE, Viewpoint Vista, CMiC
Job cost, commitments, billing and vendors
Project management
Procore, Autodesk Construction Cloud
Budgets, change orders, logs and documents
Scheduling
Primavera P6, Microsoft Project
Activities, dates and progress
Spreadsheets
The firm’s own trackers
Data that exists nowhere else, brought under control

Scopes in this service line

Smaller source system integration pieces, each with its own page, inputs and outputs.

Who this is for

The roles who rely on source data arriving complete and correct.

How an engagement runs

One source system at a time, with the checks agreed before the first load.

  1. Project Data Walkthrough

    A ninety-minute conversation at no charge, naming the source system to connect first and the outputs it should produce.

  2. Agree access

    Read access is agreed with the firm’s IT team. Nothing is ever written back to a source system.

  3. Build and check

    The connection is built and every load is compared with the source on row counts, control totals and key figures.

  4. Run on a schedule

    The connection runs on an agreed schedule, and any change in the source is caught by the checks before a report.

Exports and spreadsheets, or connected and checked

How data moves

Exports and spreadsheets: Exported by hand each month

Connected and checked: Read on a schedule

When a number is wrong

Exports and spreadsheets: Found in the meeting

Connected and checked: Flagged at the load

Project numbering

Exports and spreadsheets: Different in each system

Connected and checked: Mapped once, then reused

When a source changes

Exports and spreadsheets: The report breaks quietly

Connected and checked: The checks catch it first

Read access only, nothing written back

Every connection reads from the source system through access agreed with the firm’s IT team, and nothing is ever written back. Source systems stay exactly as they are, run by the firm and its vendors, while the model underneath reporting is kept current and checked.

Data read one way from the source system through a locked, read-only connection into the model, with nothing written back

What this does not cover

  • Changes inside the source systems themselves remain with the firm and its vendors.
  • The work connects the ERP already in place; selecting, implementing or replacing an ERP sits outside it.

Drawing and model production are delivered through bluentcad.com, not through this service.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. Security & SOC 2.

Questions AEC professionals ask

Which source system should come first?

Usually the one finance relies on most, often the accounting system. A Project Data Walkthrough identifies it.

Does this need access to production systems?

Read access, agreed with the firm’s IT team. Nothing is written back to a source system.

What happens when a source system changes?

The checks on every load show it immediately, so a change is caught before it reaches a report.

How often is the data refreshed?

On a schedule agreed with the firm, set by how current each report needs to be.

Can spreadsheets be included?

Yes. Trackers that hold data found nowhere else are brought under the same checks as the other sources.

What if two systems hold different versions of a commitment?

The rule for which version is used is agreed with the firm once, then applied on every load.

Where does source system integration work usually begin?

With a Project Data Walkthrough, at no charge, centred on source system integration: one page naming the specific problems found, and one named next step.

Next step

If construction systems are still connected by exports and spreadsheets,
talk to the team that builds this.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

A reply from the team that builds this, with one named next step. Or see the single-source pipeline build.

Engineering and technology in one firm. The people who build the data model have detailed the drawings it describes.