From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • Construction Data & Project Controls

    Construction Data Warehouse

    Projects, cost codes, vendors and commitments defined once, so every report agrees.

    Plan Your Construction Data Model
    Hand-drawn dawn over water: project, cost-code and vendor records each defined once in a layered data store, listed as clean master records, with a line-drawn swan
Project, cost-code and vendor records each defined once in a layered data store, listed as clean master records

A construction data warehouse holds the data from every source system in one model.

Projects, cost codes, vendors and commitments are defined once, so a margin figure means the same thing in every report, and each figure can be traced back to its source.

At a glance

What it covers
A layered construction data model on the firm’s chosen platform
Platforms
Microsoft Fabric, Snowflake or Databricks, with AWS Glue and Athena where the firm runs on AWS
Who is responsible
BluEnt designs, builds and tests. The firm’s finance and project controls leads approve the definitions
How it is scoped
Built one source at a time, with named outputs agreed before work begins
How it starts
A Project Data Walkthrough, at no charge

Why reports disagree

Reports disagree when each one defines the business for itself.

One counts a job by its accounting number, another by its project number. One treats a change order as committed, another does not.

A warehouse settles those definitions once. Every report then reads the same answer, and any figure can be traced back to the system it came from.

One question, three answers

“What is committed on this job?”

Finance reportApproved change orders only
Project reportPending change orders included
Board packLast month’s export

What a construction data warehouse models

Jobs, cost codes, vendors and periods, modelled once and shared by every report.

EntityWhat is defined once
ProjectOne identity across accounting, project management and scheduling
Cost codeOne structure, mapped from each system’s own codes
VendorOne record per vendor, without duplicates
Commitment and change orderOne version of what is committed, and when it changed
Schedule activityLinked to the cost it drives

Scopes in this service line

Smaller Construction data warehouse and modelling pieces, each with its own page, inputs and outputs.

Who this is for

The roles who need one set of definitions behind every report.

How the work runs

The warehouse grows one source system at a time, starting with the one finance relies on most.

  1. Agree the definitions

    Projects, cost codes, vendors and commitments are defined with finance and project controls, who approve each one.

  2. Build the first source

    The source finance relies on most is extracted, checked and modelled first.

  3. Reconcile

    The model’s totals are compared with the source’s own reports until they agree, and finance signs that off.

  4. Add the next source

    Each further source joins the same model, following the same pattern and the same checks.

Each report for itself, or one model for every report

How a project is identified

Each report for itself: A different number in each report

One model for every report: One identity everywhere

What “committed” means

Each report for itself: Decided by whoever built the report

One model for every report: Defined once, and approved

Where a figure came from

Each report for itself: Hard to say

One model for every report: Traced back to its source

Adding a new report

Each report for itself: Rebuilt from scratch

One model for every report: Built on the same model

Delivered outside construction, on the same platforms

For a multi-entity business, BluEnt consolidated data from several operating systems into one model, reconciled partner revenue-share, and built an external reporting portal with access scoped to each partner. The same platforms and modelling discipline are applied to construction data.

Several operating companies feeding one data model, and a partner portal where each partner sees only their own view

What this does not cover

  • The model works with the source systems already in place, rather than replacing them.
  • Dashboards are always built on the data model, never on their own.

Drawing and model production are delivered through bluentcad.com, not through this service.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. Security & SOC 2.

Questions AEC professionals ask

Which platform is best?

The one that fits the firm’s existing estate and skills. Microsoft Fabric, Snowflake and Databricks are all supported, and the choice is agreed before any build.

Naming a product describes the work; it is not a partnership claim.

Does everything need to be built at once?

No. The warehouse grows one source system at a time, starting with the one that matters most to finance.

Who owns the definitions?

The firm does. Finance and project controls approve each definition, so the model reflects how the business actually runs.

Can a figure in a report be traced to its source?

Yes. Each layer can be checked against the one before it, back to the raw extract from the source system.

What happens when the business changes a definition?

The definition is changed once in the model, with the owner’s approval, and every report reads the new version.

How does a construction data warehouse and modelling engagement start?

With a Project Data Walkthrough, at no charge: one page naming the specific problems found, and one named next step.

Next step

If reports still disagree because each one is built separately,
talk to the team that builds this.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

A reply from the team that builds this, with one named next step. Or see the single-source pipeline build.

Engineering and technology in one firm. The people who build the data model have detailed the drawings it describes.