From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • Project Controls & Reporting

    Cost and Schedule Integration for Construction

    Schedule activities linked to cost codes, so progress and spend are read together.

    Connect Cost and Schedule
    Hand-drawn dawn over water: schedule activities on the left linked to the cost codes they drive on the right, with one activity flagged where spend runs ahead of progress, with a line-drawn swan
Schedule activities on the left linked to the cost codes they drive on the right, with one activity flagged where spend runs ahead of progress

Cost and schedule integration in construction links schedule activities to the cost codes they drive.

Progress and spend can then be read side by side, so a project that is spending ahead of its progress shows up while there is time to respond.

At a glance

Who it is for
Directors of project controls, project executives and schedulers
Inputs
Schedules from Primavera P6 or Microsoft Project, job cost, and the cost-code structure
Outputs
Activities linked to cost codes, and progress-against-spend views
Engagement shape
Built after the data underneath is reconciled; agreed in writing before work begins
How it starts
A Project Data Walkthrough, at no charge

Why cost and schedule live apart

The schedule and the cost report are usually owned by different people in different systems.

Each is accurate on its own, but nobody sees whether the money spent matches the work done until month-end.

By then a job spending ahead of its progress has had weeks to drift, and the two reports are reviewed in separate meetings.

One job, two reports

How progress and spend are reviewed today

ScheduleOwned by the scheduler, in P6 or Project
Cost reportOwned by finance, in the ERP
ComparisonAt month-end, if at all

How cost and schedule integration works

Schedule activities matched to cost codes, so progress and spend are read together.

StepWhat happens
LinkSchedule activities mapped to the cost codes they drive, agreed with project controls
LoadSchedule progress and job cost loaded into the same model
CompareProgress and spend shown side by side, activity by activity
FlagActivities where spend runs ahead of progress are highlighted

Who this is for

The roles who need to see whether the money spent matches the work done.

Project Executive

Which jobs are spending ahead of their progress, and since when?

Scheduler

Which activities drive which costs, agreed once and kept current?

How the work runs

The link between activities and cost codes is agreed first, then built on reconciled data.

  1. Agree the link

    How schedule activities map to cost codes is agreed with project controls.

  2. Load both sides

    Schedule progress and job cost are loaded into the same model.

  3. Compare

    Progress and spend are compared activity by activity, and any gap is flagged.

  4. Refresh

    The comparison is refreshed on a schedule matching how often schedules are updated.

Separate meetings, or one view

Where progress and spend are seen

Separate meetings: In two reports, by two teams

One view: Side by side, on one screen

When a gap shows

Separate meetings: At month-end

One view: As soon as it opens

How activities relate to cost

Separate meetings: Assumed

One view: Mapped and agreed

What the review discusses

Separate meetings: Whose figures are right

One view: What to do about the gap

Built on reconciled data, never on its own

Reporting is only as good as the data underneath it. A report built on unreconciled data fails the first time a number does not tie to the ledger, and trust is hard to win back. So reporting is built after the data is in order: source systems connected through construction ERP data integration, and modelled in the construction data warehouse. Where that groundwork does not yet exist, it comes first.

Reporting comes last

The order every report is built in

Source systemsConnected and checked first
Data modelDefined once, reconciled to source
ReportingBuilt on top, tied to the ledger

What this does not cover

  • Cost estimates come from the firm’s teams. The integration presents them; it does not produce them.
  • Scheduling itself, including schedule creation and review, stays with the firm’s planners.

Drawing and model production are delivered through bluentcad.com, not through this service.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. Security & SOC 2.

Questions AEC professionals ask

Which scheduling tools are covered?

Primavera P6 and Microsoft Project. Naming a product describes the work; it is not a partnership claim.

Do schedules need to be cost-loaded already?

No. The link between activities and cost codes is agreed with project controls as part of the work.

How often is the comparison updated?

On a schedule agreed with the firm, usually matching how often schedules are updated.

What if one activity drives several cost codes?

That is common. The mapping is agreed with project controls, so each cost code is counted once.

What is the first step in cost and schedule integration?

With a Project Data Walkthrough, at no charge, centred on cost and schedule integration: one page naming the specific problems found, and one named next step.

Next step

If cost and schedule are still reviewed in separate meetings,
talk to the team that builds this.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

A reply from the team that builds this, with one named next step. Or see the project controls dashboard.

Engineering and technology in one firm. The people who build the data model have detailed the drawings it describes.