From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • Information Governance & AI-Readiness

    Common Data Environment Setup for Construction

    One controlled place for project files, set up and handed over.

    Plan Your CDE Rollout
    Banner image for CDE Structure & Rollout

CDE Structure & Rollout

A common data environment is the one controlled place where a project's files live, with agreed names, approvals and access. Common data environment setup for construction configures it on the platform a firm already uses, moves live projects in, and trains the people who run it.

  1. PlatformAn assessment of the existing platform
  2. DesignA structure for files and approvals
  3. ConfigurationRoles and permissions in place
  4. RolloutTeams using it from day one

Common data environment setup for construction at a glance

Who
information managers, heads of digital delivery
Inputs
the chosen platform and the firm's standards
Outputs
a configured environment, a template project and trained administrators
Who is responsible
BluEnt configures and trains; the firm runs it
Shape
fixed scope

The problem

Platforms are licensed but never set up properly, so every project is organised differently inside them.

  • A platform that was never set upthe firm licensed a common data environment, but each project uses it differently. A configured structure gives every project the same starting point.
  • Unclear file statusteams can't tell whether a file is in progress, shared or approved. Clear statuses remove the doubt.
  • Too many people can approveapprovals happen informally, and mistakes slip through. Defined roles make approvals clear.

What a CDE setup delivers

The environment configured, populated and handed over.

Platform configurationSet up to the agreed structure
Workflows and approvalsHow files move from draft to approved
Roles and permissionsWho can do what, by role
Issue and transmittal flowsHow files are sent and tracked
Template projectA ready-made project to copy
Live project migrationCurrent projects moved in
Administrator handoverTraining for the people who run it

How the work runs

From the first look to a result the firm keeps.

  1. Review the platform

    BluEnt studies the current setup and how projects use it today.

  2. Design the structure

    BluEnt designs the folder structure, file statuses and approval steps, in North American terms.

  3. Configure

    BluEnt configures the environment, roles and permissions on the existing platform.

  4. Roll out

    BluEnt hands over with hands-on training for each project team.

What the firm receives

Named outputs, agreed in writing before the work begins.

Written for the people who will use the CDE structure and rollout work, and kept by the firm when it ends ends.

A configured environmentOn the platform the firm already owns
A folder and status structureHow files move from work in progress to shared and published
Roles and permissionsWho can upload, review and approve
Handover and trainingSo the environment is used from the first project

What this does not cover

Platform licences. The platform stays the firm's own; it is configured, not replaced.

Licensed, or actually set up

Where firms usually start with CDE structure and rollout, and what changes once the work is done.

Structureper projectone template
Approvalsby emailin the platform
Accessad hocby role

Who this is for

  • Firms without a working common data environment or with one that was never fully set up
  • BIM and information managers who need one controlled place for project files
  • Project teams who want clear status and approval for shared files
No new platform neededThe work is applied to the drives and platforms the firm already uses.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. Security & SOC 2.

Questions about CDE Structure & Rollout

Are current projects moved in?

Yes. Live project migration is part of the work.

Who runs it afterwards?

The firm's administrators, trained at handover.

Does the firm have to buy a new platform?

No. The environment is configured on the platform it already uses.

Which terms are used?

North American practice, matched to the firm's own project stages.

Next step

If the platform is licensed but every project is organised differently,
talk to the team that builds this.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

No charge. One conversation, then a written scope with named outputs before any work begins.

Or see Information Hub: how this fits with the related services. Prefer to write first? Email us your question.