From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • Project Controls & Reporting

    WIP Reporting for Construction

    Work in progress and margin by project, tied to the ledger every month.

    Improve Your WIP Reporting
    Hand-drawn dawn over water: a WIP schedule with earned, billed and cost bars for each job, beside a margin trend that narrows month by month against the original estimate, with a line-drawn swan
A WIP schedule with earned, billed and cost bars for each job, beside a margin trend that narrows month by month against the original estimate

WIP reporting for construction shows, project by project, how much of each contract has been earned, billed and spent, and whether margin is holding.

Built on reconciled data, it ties to the ledger, so the month-end WIP schedule is read rather than rebuilt.

At a glance

Who it is for
CFOs, controllers and project executives
Inputs
Job cost, contract values, billing and cost-to-complete estimates from the firm’s systems
Outputs
A WIP schedule and margin views, refreshed on a schedule and tied to the ledger
Engagement shape
Built after the data underneath is reconciled; agreed in writing before work begins
How it starts
A Project Data Walkthrough, at no charge

Why WIP takes days every month

In many firms, the WIP schedule is rebuilt in a spreadsheet at each month-end.

Cost comes from accounting, estimates from project managers, and billing from another report.

Assembling them takes days, and margin fade is often noticed only when it is already large, too late to change the outcome on the job.

One WIP schedule, three inputs

Where each column comes from at month-end

Cost to dateExported from accounting
Cost to completeEmailed by project managers
Billed to dateCopied from another report

What WIP reporting for construction shows

Work in progress and margin for every job, from reconciled cost and billing data.

ViewWhat it shows
WIP scheduleContract value, cost to date, cost to complete, percent complete, earned revenue and billed to date
Over and under billingWhere billing runs ahead of, or behind, the work earned
Margin by projectForecast margin against the original estimate
Margin fadeProjects whose margin is narrowing, month by month

Who this is for

The roles who need WIP they can trust at month-end.

Controller

Can the WIP schedule be read at month-end instead of rebuilt?

How the work runs

WIP reporting is built after the data underneath reconciles.

  1. Check the groundwork

    Job cost, contract and billing data are confirmed to reconcile with the ledger, or brought into order first.

  2. Agree the WIP method

    The firm’s own way of calculating earned revenue and margin is agreed with finance.

  3. Build the views

    The WIP schedule, billing position and margin views are built on the reconciled model.

  4. Review at month-end

    The views are reviewed with finance at month-end, then refreshed on a schedule.

Rebuilt each month, or read each month

Preparing the WIP schedule

Rebuilt each month: Days in a spreadsheet

Read each month: Refreshed from the model

Tie to the ledger

Rebuilt each month: Checked by hand, if at all

Read each month: Built in from the start

Margin fade

Rebuilt each month: Noticed when it is already large

Read each month: Visible as it begins

Over and under billing

Rebuilt each month: Worked out separately

Read each month: Shown for every job

Margin fade, seen early

Margin rarely disappears in one month. It narrows a little at a time. Showing the trend for every project makes the narrowing visible while there is still time to act. Like every report, it is built on reconciled data: source systems connected through construction ERP data integration, and modelled in the construction data warehouse.

Margin, month by month

How fade shows up on one project

Original estimateThe margin the job was won at
Each month sinceA little narrower than the last
Seen earlyWhile there is still time to act

What this does not cover

  • Cost-to-complete estimates come from the firm’s project teams. The report presents them; it does not produce them.
  • Accounting, audit and revenue-recognition advice stays with the firm’s accountants and auditors.

Drawing and model production are delivered through bluentcad.com, not through this service.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. Security & SOC 2.

Questions AEC professionals ask

Does the WIP report replace the accounting system’s own?

No. It reads from the accounting system and ties to it. The ledger remains the system of record.

Where do cost-to-complete estimates come from?

From the firm’s project teams, through the process they already use. The report brings them together with cost and billing.

What if the data underneath does not reconcile?

Then that comes first. A WIP report on unreconciled data would not tie to the ledger, and finance would rightly not trust it.

Whose WIP method is used?

The firm’s own. The way earned revenue and margin are calculated is agreed with finance before anything is built.

Can over and under billing be seen for every job?

Yes. Billing is compared with work earned, project by project, in the same view as margin.

Where does WIP and margin reporting work usually begin?

With a Project Data Walkthrough, at no charge, centred on WIP and margin reporting: one page naming the specific problems found, and one named next step.

Next step

If the WIP schedule still takes days to assemble every month,
talk to the team that builds this.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

A reply from the team that builds this, with one named next step. Or see the construction data warehouse.

Engineering and technology in one firm. The people who build the data model have detailed the drawings it describes.