From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • Source System Integration

    Sage 300 CRE Data Extraction

    Job cost, commitments and billing read out of construction accounting systems, checked against their own totals.

    Connect Sage 300 CRE to Reporting
    Hand-drawn dawn over water: a job-cost ledger from a construction accounting system extracted through a filter into one model, as clean job, cost-code and commitment records, with a line-drawn swan
A job-cost ledger from a construction accounting system extracted through a filter into one model, as clean job, cost-code and commitment records

Sage 300 CRE data extraction reads job cost, commitment, billing and vendor data out of the accounting system and loads it into a model where it can be reported with other data. The same approach covers Viewpoint Vista.

Naming a product describes the work; it is not a partnership claim.

Every extraction is checked against the accounting system’s own totals.

At a glance

Inputs
Read access to Sage 300 CRE or Viewpoint Vista, and the firm’s standard job cost reports
Outputs
Scheduled, checked extractions of job cost, commitments, billing and vendors
Who is responsible
BluEnt builds and tests. The firm’s finance team confirms the control totals
Engagement shape
A build with named outputs, agreed in writing before work begins
How it starts
A Project Data Walkthrough, at no charge

Where accounting data gets stuck

The accounting system holds the figures finance trusts, but they rarely leave it cleanly.

Job cost, commitments and billing reach reports through manual exports, re-keyed and reformatted each month.

Every export is a snapshot that starts ageing the moment it is taken. When a report disagrees with the accounting system, finance spends the meeting proving which copy is current instead of discussing the job.

One job, three copies

Where the same job cost figure ends up

Accounting systemThe figure finance trusts
Monthly exportA snapshot, already ageing
Report spreadsheetRe-keyed and reformatted

What Sage 300 CRE data extraction delivers

Accounting data extracted on a schedule, ready for reporting, from either system.

DataCovered in Sage 300 CRE and Viewpoint Vista
Job cost by cost codeCovered in both systems
Commitments and subcontractsCovered in both systems
Billing and receivablesCovered in both systems
VendorsCovered in both systems
Checked againstEach system’s own job cost reports

Who this is for

The roles who need accounting data in reports without a manual export.

Controller or Finance Manager

Can month-end reporting start without exporting and re-keying job cost?

How the work runs

From the accounting system as it stands to extracts checked against its own totals.

  1. Agree which data

    The data to extract, and the reports finance already trusts, are agreed with finance.

  2. Build

    The extraction and its control-total checks are built by BluEnt.

  3. Reconcile

    Extracts are reconciled against the accounting reports, with finance, until every job matches.

  4. Schedule

    The extraction is set to run on a schedule agreed with the firm.

  5. Hand over

    The work is handed over with a runbook for the firm’s team.

Manual exports, or checked extractions

How accounting data leaves the system

Manual exports: Exported and re-keyed by hand

Checked extractions: Extracted on a schedule

How it is checked

Manual exports: Spot-checked, if at all

Checked extractions: Against the system’s own totals

When a total does not match

Manual exports: Found in the meeting

Checked extractions: Held before it is accepted

How finance works

Manual exports: Around the exports

Checked extractions: Exactly as before, in the accounting system

Checked against the accounting system’s own totals

Finance trusts the accounting system’s reports. So each extraction is checked against them: job by job, the loaded totals must match before the data is accepted. Finance keeps working in the accounting system exactly as before.

One extraction, job by job

Each job’s loaded total, compared with the accounting report

Totals matchAccepted into the model
Totals differHeld, with the difference shown
Report usedThe one finance already trusts

What this does not cover

  • Accounting system configuration, upgrades and support remain with the firm and its vendor.
  • Years of history are covered separately by historical backload.
  • Nothing is written back into the accounting system.

Drawing and model production are delivered through bluentcad.com, not through this service.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. Security & SOC 2.

Questions AEC professionals ask

Does this work with Sage 300 CRE hosted on premises?

That depends on the access available, which is confirmed with the firm’s IT team before any build begins.

Is Viewpoint Vista handled the same way?

Yes. The same extraction and control-total approach applies, through the access Viewpoint Vista provides.

Will finance need to change how it works?

No. Finance keeps working in the accounting system. The extraction reads from it and checks against its reports.

Which reports are the checks based on?

The job cost reports finance already relies on, agreed at the start, so the checks use figures finance recognises.

Can past years be included?

Years of history are loaded separately, through historical backload, so live extraction is not slowed down.

Is anything written back to the accounting system?

No. The extraction reads data only, and the accounting system stays exactly as it is.

What is the first step in Sage 300 CRE and Viewpoint extraction?

With a Project Data Walkthrough, at no charge, centred on Sage 300 CRE and Viewpoint extraction: one page naming the specific problems found, and one named next step.

Next step

If accounting data still reaches reports through manual exports,
talk to the team that builds this.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

A reply from the team that builds this, with one named next step. Or see the single-source pipeline build.

Engineering and technology in one firm. The people who build the data model have detailed the drawings it describes.