From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • Construction Data Warehouse & Modelling

    Construction Master Data Management

    One record for every project and every vendor, matched across every system.

    Align Project and Vendor Records
    Hand-drawn dawn over water: three systems each naming the same project differently, matched into one yellow master record that links back to each system, with a line-drawn swan
Three systems each naming the same project differently, matched into one yellow master record that links back to each system

Construction master data management gives every project and every vendor one governed record, matched across the accounting, project and scheduling systems.

Reports then count each project and each vendor once, under one name.

At a glance

Inputs
Project and vendor records from each source system, and the people who maintain them
Outputs
Master project and vendor records, matching rules, and a stewardship routine
Who is responsible
BluEnt builds the matching. Named data stewards at the firm approve matches and own the records
Engagement shape
A build with named outputs, agreed in writing before work begins
How it starts
A Project Data Walkthrough, at no charge

Why the same project has several names

Each system numbers projects its own way.

Accounting uses a job number, the project team a project code, the schedule a file name.

Vendors are entered again in each system, with small spelling differences. Reports that join these systems either miss matches or count the same project twice.

One project, three names

How each system records the same job

AccountingA job number
Project toolA project code
ScheduleA file name

What construction master data management puts in place

One master record for each project and vendor, matched across every system.

ElementWhat it does
Master project recordOne identity per project, linked to its number in every system
Master vendor recordOne record per vendor, with duplicates resolved
Matching rulesHow records from each system are matched, written down and agreed
Stewardship routineWho approves new matches, and how often

Who this is for

The roles who need every project and vendor counted once.

How the work runs

From the names each system uses today to one agreed master record.

  1. Profile

    Project and vendor records are profiled in each system by BluEnt.

  2. Agree the matching rules

    BluEnt drafts the rules and the firm approves them, naming the data stewards.

  3. Build

    The master records and the matching are built by BluEnt.

  4. Review

    Matches are reviewed with the stewards, and every exception is resolved.

  5. Hand over

    The work is handed over with the stewardship routine.

Several names, or one master record

How a project is counted

Several names: Once per system it appears in

One master record: Once, under one name

Duplicate vendors

Several names: Spread across systems

One master record: Resolved into one record

New projects

Several names: Entered again, slightly differently

One master record: Matched as they appear

Who decides a match

Several names: Whoever builds the report

One master record: A named data steward

Stewards decide, rules propose

Matching is never left entirely to software. The matching rules propose which records belong together, and named data stewards at the firm approve them. The source systems are not changed: the master record links to each system’s own number.

How a new record is handled

Through the stewardship routine

Clear matchLinked to the master record
Possible matchSent to a steward to approve
No matchCreated as a new master record

What this does not cover

  • Vendor onboarding and compliance checks stay with the firm’s procurement team.
  • Cleaning records inside the source systems remains with the firm. The master record shows where to start.

Drawing and model production are delivered through bluentcad.com, not through this service.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. Security & SOC 2.

Questions AEC professionals ask

Who decides when two records are the same?

Named data stewards at the firm. The matching rules propose; the stewards approve.

Do the source systems change?

No. The master record links to each system’s own number without changing it.

How are new projects handled?

Through the stewardship routine: new records are matched as they appear and approved by a steward.

Does this cover vendors as well as projects?

Yes. Vendors entered separately in each system are resolved into one record, so spend is counted once.

How much of the stewards’ time does it take?

The routine is agreed with the firm, and only possible matches reach a steward; clear matches are linked under rules the stewards approved.

Where does project and vendor master data work usually begin?

With a Project Data Walkthrough, at no charge, centred on project and vendor master data: one page naming the specific problems found, and one named next step.

Next step

If the same project or vendor appears under several names,
talk to the team that builds this.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

A reply from the team that builds this, with one named next step. Or see the construction data warehouse.

Engineering and technology in one firm. The people who build the data model have detailed the drawings it describes.