From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • Project Controls & Reporting

    Bid Hit Rate Analysis for Construction

    Past bids analysed to show which work is won, and which work earns.

    Analyse Your Bid History
    Hand-drawn dawn over water: past bids shown as cards, won or lost, with each won bid linked to the margin the job finally earned, with a line-drawn swan
Past bids shown as cards, won or lost, with each won bid linked to the margin the job finally earned

Bid hit rate analysis for construction looks at a firm’s past bids by client, sector, size and estimator, and links each won bid to the margin the job finally earned.

It shows not only where the firm wins, but where winning is worth it.

At a glance

Who it is for
Preconstruction directors, estimating leads and executives deciding what to bid
Inputs
Bid records, the projects they became, and those projects’ final cost and margin
Outputs
Hit rate and margin views by client, sector, size and estimator
Engagement shape
Built after the data underneath is reconciled; agreed in writing before work begins
How it starts
A Project Data Walkthrough, at no charge

Why the bid log is rarely used

Most firms keep a record of what they bid, but it sits apart from what happened next.

Won bids are not linked to the job’s final margin, and lost bids are not analysed at all.

So the decision to bid rests on memory and instinct, even though years of evidence already sit in the firm’s own systems.

One bid log, two missing links

What the bid record usually leaves out

Won bidsNot linked to the job’s final margin
Lost bidsNot analysed at all
Decision to bidMade on memory and instinct

What bid hit rate analysis for construction shows

Bids won and lost, by client, sector and size, from the firm’s own history.

ViewThe question it answers
Hit rate by client and sectorWhere does the firm win most often?
Hit rate by project sizeWhich size of job does the firm win, and lose?
Won work against final marginWhich wins actually earn?
Estimator viewHow does each estimator’s work perform after award?

Who this is for

The roles who decide which work is worth pursuing.

Head of Estimating

Which bids are worth pursuing, judged by past win rates and the margin those jobs delivered?

Preconstruction Director

Which clients, sectors and sizes of job does the firm win, and lose?

How the work runs

Bid analytics is built on reconciled history, linked bid by bid to the jobs they became.

  1. Find the history

    Where past bids sit today is found, and loaded through historical backload if needed.

  2. Link bids to jobs

    Each won bid is linked to its job through project master data.

  3. Build the views

    Hit rate and margin views are built by client, sector, size and estimator.

  4. Review with preconstruction

    The views are reviewed with the people who decide what to bid.

Memory and instinct, or the firm’s own evidence

Where the firm wins

Memory and instinct: Remembered, roughly

The firm’s own evidence: Shown by client, sector and size

Which wins earn

Memory and instinct: Rarely known

The firm’s own evidence: Linked to final margin

Lost bids

Memory and instinct: Forgotten

The firm’s own evidence: Analysed alongside wins

The decision to bid

Memory and instinct: Instinct

The firm’s own evidence: Informed by history, made by people

Winning against earning

A high hit rate is not the goal on its own. Linking each won bid to the margin the job earned shows which work is worth pursuing. Like every report, it rests on reconciled data, modelled in the construction data warehouse.

Two ways to read a bid record

What a win means, with and without the final margin

Hit rate aloneHow often the firm wins
Hit rate with marginWhich wins were worth it
The decisionStill made by the people who bid

What this does not cover

  • The analysis uses the firm’s own bid history, rather than market forecasts.
  • Estimating itself stays with the firm’s estimators, using the software they already run.

Drawing and model production are delivered through bluentcad.com, not through this service.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. Security & SOC 2.

Questions AEC professionals ask

How much bid history is needed?

Enough for patterns to be meaningful, which depends on how often the firm bids. The Walkthrough gives an early read.

What if bids and jobs are not linked today?

That link is built as part of the work, through master data, so each won bid can be followed to its job.

Does this tell the firm what to bid?

No. It shows the evidence from the firm’s own history. The decision stays with the people who make it.

Are lost bids useful?

Yes. Seeing where and why the firm loses, by client, sector and size, is as useful as seeing where it wins.

How does a preconstruction and bid analytics engagement start?

With a Project Data Walkthrough, at no charge, centred on preconstruction and bid analytics: one page naming the specific problems found, and one named next step.

Next step

If the bid log is kept but rarely used,
talk to the team that builds this.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

A reply from the team that builds this, with one named next step. Or see the project controls dashboard.

Engineering and technology in one firm. The people who build the data model have detailed the drawings it describes.