From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • Construction Data Warehouse & Modelling

    Construction Data Migration and Archive

    Years of project history brought into the model, and old systems retired with care.

    Plan Your Historical Data Backload
    Hand-drawn dawn over water: a legacy server and stacked years of history flowing into the model, with other records kept in a searchable archive cabinet, with a line-drawn swan
A legacy server and stacked years of history flowing into the model, with other records kept in a searchable archive cabinet

Construction data migration and archive work loads years of project history into the data model, checks it against the original totals, and retires the old systems that held it.

The history becomes usable for analysis, and nothing is lost when a system is switched off.

At a glance

Inputs
Access to current and legacy systems, and the reports that describe their history
Outputs
History loaded and checked, a searchable archive, and a retirement plan for each legacy system
Who is responsible
BluEnt loads, checks and archives. The firm decides what to keep and approves each retirement
Engagement shape
Scoped work with named outputs, agreed in writing before work begins
How it starts
A Project Data Walkthrough, at no charge

Why history matters

The best guide to the next bid is the record of past bids like it.

That history usually sits in old systems, in formats no current report can read.

Often those systems are kept running only to preserve what they hold, with licences, servers and the one person who still knows how to query them.

Years of history, out of reach

Where past project data sits today

Legacy systemKept running only to preserve it
Old exportsIn formats no report can read
Current modelOnly recent years

What construction data migration and archive work covers

Past years brought into the model, and old systems retired in an agreed order.

AreaWhat it covers
Historical backloadPast years of project, cost and vendor data loaded into the model
Year-by-year checksEach year’s totals compared with the original system’s reports
Searchable archiveRecords that do not belong in the model kept in a form people can still find
System retirementA step-by-step plan to switch off each legacy system safely

Who this is for

The roles who need past projects to be findable and usable.

How the work runs

From what each old system holds to history the firm can report on.

  1. Inventory

    The legacy systems, and what each one holds, are inventoried by BluEnt.

  2. Agree what is kept

    BluEnt drafts what goes into the model and what goes into the archive; the firm approves it.

  3. Load and check

    History is loaded and checked year by year.

  4. Archive

    The remaining records are archived in searchable form.

  5. Retire

    Each system is retired once the business confirms access, by the firm with BluEnt.

Kept running, or brought across

Where history sits

Kept running: In systems kept alive to preserve it

Brought across: In the model, or a searchable archive

Who can use it

Kept running: Whoever still knows the old system

Brought across: Anyone with access to the reports

How it is checked

Kept running: It is not

Brought across: Year by year, against the original totals

The old system

Kept running: Running, with its costs

Brought across: Retired, once access is confirmed

Into the model, or into the archive

Not everything belongs in the model. Data useful for analysis, such as past project, cost and vendor history, is loaded and checked. Other records are kept in a searchable archive, so they can still be found when needed. The firm’s own retention rules decide what is kept; retention policy itself is covered under information governance.

Where each record goes

Decided with the firm, before anything is moved

Useful for analysisLoaded into the model and checked
Needed for referenceKept in the searchable archive
Beyond retentionHandled by the firm’s own rules

What this does not cover

  • Hardware decommissioning remains with the firm’s IT team.
  • Retention periods are set with the firm’s own legal and regulatory advisers. The firm’s own retention rules decide what is kept.

Drawing and model production are delivered through bluentcad.com, not through this service.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. Security & SOC 2.

Questions AEC professionals ask

How far back can history go?

As far as the legacy systems hold usable data. Each year is checked against the original totals before it is accepted.

Can a legacy system be switched off?

Once its data is loaded or archived and the business confirms it can find what it needs. The firm approves each retirement.

Is everything loaded into the model?

No. Data useful for analysis goes into the model. Other records go into a searchable archive.

What if an old system’s data does not match its own reports?

The difference is shown year by year, and the firm decides how each one is treated before it is accepted.

Who decides what is kept?

The firm, under its own retention rules. BluEnt drafts what goes where, and the firm approves it.

How does a historical backload and archive rationalisation engagement start?

With a Project Data Walkthrough, at no charge, centred on historical backload and archive rationalisation: one page naming the specific problems found, and one named next step.

Next step

If years of history still sit in systems nobody wants to switch off,
talk to the team that builds this.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

A reply from the team that builds this, with one named next step. Or see the construction data warehouse.

Engineering and technology in one firm. The people who build the data model have detailed the drawings it describes.