Reporting that refreshes on a schedule every month
When the same project report is rebuilt by hand every month, the team spends its time assembling numbers instead of acting on them.
BluEnt helps project controls teams connect cost and schedule to one reconciled source, so the monthly report refreshes on its own and progress and spend are read side by side.
Sound familiar?
Three moments most project controls teams will recognise. Each one costs time every month, and none of them is fixed by working harder on the spreadsheet.
The monthly rebuild
Exports, spreadsheets and copy and paste, every month, for the same report. One wrong cell, and the whole review is questioned.
Cost and schedule in separate rooms
Progress is reviewed in one meeting and spend in another, so nobody sees whether a job is late and over budget at the same time.
Answers that arrive too late
By the time the report is assembled, the decisions it should have informed have already been made.
What changes
The same report, with cost and schedule together, read from one reconciled source instead of assembled by hand from separate exports.
The report is rebuilt by hand
The report refreshes from one source
Schedule and cost live apart
Activities are matched to cost codes
Variances are found at month-end
Variances show at each scheduled refresh
Time goes on assembling numbers
Time goes on acting on them
Where BluEnt helps
Three pieces of work that turn the monthly report into a routine that refreshes on a schedule.

Join cost and schedule
Schedule activities from Primavera P6 or Microsoft Project matched to cost codes, so progress and spend are read together.
Cost & Schedule Integration
Automate the monthly report
A project controls dashboard built on reconciled data, refreshed without rework.
Project Controls & Reporting
Track WIP and margin
Work in progress and margin for every job, from the same source as the rest of the report.
WIP & Margin ReportingHow the work starts
Four steps, from a no-charge conversation to a report that refreshes on a schedule.
Walkthrough
One conversation and one page naming three problems.
Pick one report
The most time-consuming monthly report, chosen first.
Automate it
Built on reconciled cost and schedule data, then checked.
Add the rest
Further reports on the same source.
Delivery model and security
Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.
SOC 2 Type I and Type II attestations held. See Security & SOC 2.
Questions project controls teams ask
Which scheduling tools can be connected?
Primavera P6 and Microsoft Project, alongside the firm’s accounting and project-management systems.
Will the numbers match the accounting system?
Yes. Every figure is reconciled against the accounting system’s own totals before it reaches a report.
Does the team have to change how it schedules?
No. The schedule stays in the tool the team already uses, and the work reads from it.
Can the work start with the report that takes longest each month?
Yes. The first piece of work is usually the report that takes longest each month.
Who maintains the reports afterwards?
The firm’s own team, with documentation.
"*" indicates required fields
Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

