From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003

Skilled people, back on the work only they can do

When skilled people spend their days rebuilding models and redrawing parts for the shop, the backlog grows faster than any hire can close it.

BluEnt helps BIM and VDC directors automate the repetitive work: templates that hold, data that moves from the model to fabrication on its own, and handoffs that no longer wait in someone’s inbox.

Sound familiar?

Three moments most BIM and VDC teams will recognise. Each one is repetitive work that a standard or an automated handoff can take away.

The same model, rebuilt again

Every project starts from a different template, so the same families, views and sheets are set up by hand once more.

Redrawn for the shop

Parts modelled in Revit are redrawn in Cabinet Vision or Microvellum, then checked by hand before a CNC program is written.

The hire that never comes

The role that would fix it cannot be filled, and the people who could do it are busy with the repetitive work.

What changes

The same team, with the repetition taken out, so skilled time goes back to design and coordination.

Each project starts from its own template

Every project starts from one standard

Parts are redrawn for fabrication

Part data flows from the model

Handoffs wait in inboxes

Handoffs move on their own

Skilled time goes on repetition

Skilled time goes on design

How the work starts

Four steps, from a no-charge conversation to repetitive work removed.

Walkthrough

One conversation and one page naming three problems.

Pick one task

The most repetitive task, chosen first.

Automate and test

Built, then tested on the firm’s own sample jobs.

Hand over

Documented, so the firm’s own team runs it.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. See Security & SOC 2.

Questions BIM and VDC directors ask

Does this replace the team?

No. It removes the repetitive work, so the team spends its time on design and coordination.

Which software is covered?

Revit, AutoCAD, Cabinet Vision, Microvellum, CNC post-processors, Procore and Autodesk Construction Cloud.

Who maintains the automation?

The firm’s own team, with documentation written for it.

Can the work start with one task?

Yes. The first piece of work is usually the task that repeats most often.

Do the people who build it know production work?

Yes. The people who build the automation also produce AEC drawings and models.

Next step

If skilled people still rebuild the same work,
talk to the team that builds this from BluEnt.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

Prefer to write first? Email us your question. A reply follows with an answer or one named next step.