From drawings to data to AI · Since 2003
BluEntEnterprise IT
  • Contact
Our two areas of expertise
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Book a Project Data Discussion →
Our expertise
AEC Technology

Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Problems we solve, and the services that solve them
What we do

Automation and project data, from AEC production specialists since 2003.

  • Producing AEC drawings since 2003
  • Microvellum, Cabinet Vision and CNC output in daily production
  • Procore, Sage, Viewpoint and CMiC integration
Sectors
Insights
How we work
Not sure where to start?
Project Data Walkthrough
90 minutes, free. A one-page read on where your project data breaks, and one named next step.
Discuss Your Data Priorities
From drawings to data to AI · Since 2003
  • Templates, Standards & Deployment

    Revit Standards Consultant

    Templates, content and drawing standards that hold from one project to the next.

    Standardise Your Revit Templates
    A swan in flight over calm water beside a glass building, with production steps shown along the horizon
One governed standard feeding project templates, content libraries and drawing standards, so every new project starts from the same source

A Revit standards consultant sets up the templates, content libraries and drawing standards an AEC firm works from, and puts them where every new project picks them up.

BluEnt does this work from the drafting side: the same firm has produced construction drawings since 2003.

At a glance

Who it is for
Design technology leads, BIM managers and principals of AEC firms
What it covers
Revit and AutoCAD project templates, content libraries, drawing standards and how they reach each project
Who is responsible
BluEnt reviews, drafts and builds. The firm’s design technology lead approves the standard
How it is scoped
Agreed in writing before work begins, from the firm’s own templates and recent projects
How it starts
A Project Data Walkthrough, at no charge

Why standards drift between projects

Standards usually drift because each new project starts from a copy of the last one.

A team copies the previous job’s template, renames a few families and changes a title block. The next team copies that copy.

After a few projects, two drawings from the same firm no longer match. Line weights differ, view templates disagree, and families with the same purpose carry different names, so schedules and quantities stop lining up. The standards document often still exists, but it describes the template as it was written, not as it is used.

Each project copying the last one, with families renamed, title blocks changed and line weights drifting, until drawings from the same firm no longer match

What a Revit standards consultant puts in place

The work fixes the standard in the files people actually open, not only in a document.

AreaWhat it covers
Project templatesRevit and AutoCAD templates with agreed view templates, sheets, title blocks, line weights and annotation
Content librariesFamilies and blocks named, parameterised and organised to one convention
Drawing standardsSheet setup, naming, numbering and annotation rules, written down and built into the template
DeploymentOne governed location for the current template and library, so every new project starts from the same source
Change controlA single owner and a simple route for change requests, so the standard evolves without forking
Project setup checklistA short list used when each new project is created, so the standard is applied from the first day
One firm standard covering templates, families, sheets, line weights, annotation and change control, reviewed, built and published to one location

How the work runs

From an audit of today’s templates to a standard the firm’s own team maintains.

  1. Review

    The current templates, the library and a sample of recent projects are read, noting where they disagree.

  2. Agree the standard

    BluEnt drafts it; the firm’s design technology lead approves it.

  3. Build

    Templates, content and documentation are built to the approved standard.

  4. Pilot

    The standard is used on one live project, and anything that does not hold up in practice is corrected.

  5. Deploy and hand over

    The template and library are published to one governed location, with the change-control route and documentation.

A standard in a document, or a standard in the template

Where the rule lives

Standard in a document: A PDF that few people reopen

Standard in the template: The template every project starts from

What a new starter learns from

Standard in a document: Whatever project is open

Standard in the template: The same governed source

What happens on the next project

Standard in a document: The last copy is copied again

Standard in the template: The current standard is used

How changes are made

Standard in a document: Informally, project by project

Standard in the template: Through one owner, then published

Where standards pay off

Consistent families and parameters are what make later automation possible. Fabrication pipelines, IFC and COBie exports and project data all depend on content that is named and structured the same way on every job. A standard set here is the groundwork for everything that reads the model afterwards.

Consistent families and parameters feeding fabrication pipelines, IFC and COBie exports and project data

What this does not cover

  • The work sets the standard in templates and content, rather than building Revit add-ins, API tools or automated model checkers.
  • Formal ISO 19650 information-management roles sit outside this work.

Drawing production is delivered through bluentcad.com, not through this service.

Delivery model and security

Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.

SOC 2 Type I and Type II attestations held. Security & SOC 2.

Questions AEC professionals ask

Can existing templates be corrected rather than replaced?

Often, yes. The review shows which parts of the current template hold up and which have drifted. The decision to correct or rebuild is made with the firm’s design technology lead before any work begins.

Does this cover AutoCAD as well as Revit?

Yes. AutoCAD templates, blocks and drawing standards are covered alongside Revit, so drawings produced in either tool follow the same rules.

Who owns the standard after handover?

The firm does. The handover names a single owner and a route for change requests, so the standard can evolve without each project creating its own version.

How is the standard tested before it is rolled out?

On one live project first. Anything that does not hold up in practice is corrected before the standard is deployed.

Where do new projects get the template from?

One governed location, so every new project starts from the current standard rather than a copy of the last job.

How does a templates, standards and deployment engagement start?

With a Project Data Walkthrough, at no charge, centred on templates, standards and deployment: one page naming the specific problems found, and one named next step.

Next step

If every project still starts from a different template,
talk to the team that builds this.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy

A reply from the team that builds this, with one named next step. Or see all BIM automation services.

Engineering and technology in one firm. The people who build the automation have produced the drawings it reads.